Seminole - Muskogee 345 kV line (GEN-2024-236)

Seminole - Muskogee 345 kV line is a 241.4 MW wind interconnection project in Okfuskee, Oklahoma with a current status of operational. It is proposed to connect at Seminole - Muskogee 345 kV line.

241.4 MWCapacity
OperationalStatus
OKMarket
WindTechnology

Project facts

Canonical nameSeminole - Muskogee 345 kV line
Queue IDGEN-2024-236
Statusoperational
Source statusDISIS STAGE
MarketOK
TechnologyWind
Capacity241.4 MW
StateOklahoma
CountyOkfuskee
Point of interconnectionSeminole - Muskogee 345 kV line
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2029-09-03
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata