Seminole Solar I (IC-860)
Seminole Solar I is a 400.0 MW other interconnection project in Baldwin County, Alabama with a current status of operational.
400.0 MWCapacity
OperationalStatus
ALMarket
OtherTechnology
Project facts
| Canonical name | Seminole Solar I |
|---|---|
| Queue ID | IC-860 |
| Status | operational |
| Source status | — |
| Market | AL |
| Technology | Other |
| Capacity | 400.0 MW |
| State | Alabama |
| County | Baldwin County |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Alabama Power Co |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata