Setab 345 kV (GEN-2023-107)

Setab 345 kV is a 300.0 MW wind interconnection project in Finney/Kearny, Kansas with a current status of active. It is proposed to connect at Setab 345 kV.

300.0 MWCapacity
ActiveStatus
KSMarket
WindTechnology

Project facts

Canonical nameSetab 345 kV
Queue IDGEN-2023-107
Statusactive
Source statusFACILITY STUDY STAGE
MarketKS
TechnologyWind
Capacity300.0 MW
StateKansas
CountyFinney/Kearny
Point of interconnectionSetab 345 kV
Requested (queue) date2023-10-02
Proposed in-service date2030-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata