Shenango-Bedford 69kV (AA2-166)

Shenango-Bedford 69kV is a 19.9 MW gas interconnection project in Lawrence, Pennsylvania with a current status of withdrawn.

19.9 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameShenango-Bedford 69kV
Queue IDAA2-166
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity19.9 MW
StatePennsylvania
CountyLawrence
Point of interconnection—
Requested (queue) date2015-04-30
Proposed in-service date2017-06-01
Operational date—
Withdrawn date2016-07-08
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.