Shenango-McDowell 138kV (AD2-120)

Shenango-McDowell 138kV is a 120.0 MW solar interconnection project in Mercer, Pennsylvania with a current status of withdrawn.

120.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameShenango-McDowell 138kV
Queue IDAD2-120
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity120.0 MW
StatePennsylvania
CountyMercer
Point of interconnection
Requested (queue) date2018-03-22
Proposed in-service date2020-12-15
Operational date
Withdrawn date2019-06-19
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata