Shidler 138 kV Substation (GEN-2016-127)

Shidler 138 kV Substation is a 200.1 MW wind interconnection project in Osage, Oklahoma with a current status of withdrawn. It is proposed to connect at Shidler 138 kV Substation.

200.1 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameShidler 138 kV Substation
Queue IDGEN-2016-127
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity200.1 MW
StateOklahoma
CountyOsage
Point of interconnectionShidler 138 kV Substation
Requested (queue) date2016-11-22
Proposed in-service date
Operational date
Withdrawn date2020-12-07
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata