Shoemaker Energy Storage (1253)

Shoemaker Energy Storage is a 5.5 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Shoemaker.

5.5 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameShoemaker Energy Storage
Queue ID1253
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity5.5 MW
StateNew York
CountyOrange
Point of interconnectionShoemaker
Requested (queue) date2021-09-15
Proposed in-service date2021-11-30
Operational date
Withdrawn date
DeveloperAlliance Energy Storage, LLC
Utility / transmission ownerO&R

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata