Sibley - Hawthorne 345 kV line (GEN-2024-217)

Sibley - Hawthorne 345 kV line is a 250.0 MW battery interconnection project in Jackson, Missouri with a current status of withdrawn. It is proposed to connect at Sibley - Hawthorne 345 kV line.

250.0 MWCapacity
WithdrawnStatus
MOMarket
BatteryTechnology

Project facts

Canonical nameSibley - Hawthorne 345 kV line
Queue IDGEN-2024-217
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyBattery
Capacity250.0 MW
StateMissouri
CountyJackson
Point of interconnectionSibley - Hawthorne 345 kV line
Requested (queue) date2025-03-01
Proposed in-service date2029-12-31
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata