Sibley to Overton 345kV (GEN-2018-123)

Sibley to Overton 345kV is a 200.0 MW wind interconnection project in Ellsworth, Kansas with a current status of withdrawn. It is proposed to connect at Sibley to Overton 345kV.

200.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameSibley to Overton 345kV
Queue IDGEN-2018-123
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity200.0 MW
StateKansas
CountyEllsworth
Point of interconnectionSibley to Overton 345kV
Requested (queue) date2018-11-21
Proposed in-service date2025-12-31
Operational date
Withdrawn date2023-01-04
Developer
Utility / transmission ownerKCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata