Sigel - Auburndale Tap (Y-107) 69kV (J2833)

Sigel - Auburndale Tap (Y-107) 69kV is a 40.0 MW solar interconnection project in Wood, Wisconsin with a current status of withdrawn. It is proposed to connect at Sigel - Auburndale Tap (Y-107) 69kV.

40.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSigel - Auburndale Tap (Y-107) 69kV
Queue IDJ2833
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity40.0 MW
StateWisconsin
CountyWood
Point of interconnectionSigel - Auburndale Tap (Y-107) 69kV
Requested (queue) date2022-09-12
Proposed in-service date2025-03-01
Operational date2025-03-01
Withdrawn date2025-07-30
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.