Sign Post - Stockton 69 kV (AH2-379)

Sign Post - Stockton 69 kV is a 28.3 MW solar interconnection project in Worcester, Maryland with a current status of withdrawn.

28.3 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameSign Post - Stockton 69 kV
Queue IDAH2-379
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity28.3 MW
StateMaryland
CountyWorcester
Point of interconnection—
Requested (queue) date2022-03-10
Proposed in-service date2026-03-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.