Silver Creek (7988_3)

Silver Creek is a 83.5 MW gas interconnection project in Jefferson Davis, Mississippi with a current status of operational.

83.5 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameSilver Creek
Queue ID7988_3
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity83.5 MW
StateMississippi
CountyJefferson Davis
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2005-06-01
Withdrawn date—
Developer—
Utility / transmission ownerCOOPERATIVE ENERGY

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata