Silver Maple Wind CNR (1020)
Silver Maple Wind CNR is a 20.0 MW wind interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at Emera Maine 115kV Transmission Line 66, between Graham Substation and Rebel Hill substation, adjacent to Pisgah Mountain Wind Farm..
20.0 MWCapacity
OperationalStatus
BHEMarket
WindTechnology
Project facts
| Canonical name | Silver Maple Wind CNR |
|---|---|
| Queue ID | 1020 |
| Status | operational |
| Source status | C |
| Market | BHE |
| Technology | Wind |
| Capacity | 20.0 MW |
| State | Maine |
| County | Penobscot |
| Point of interconnection | Emera Maine 115kV Transmission Line 66, between Graham Substation and Rebel Hill substation, adjacent to Pisgah Mountain Wind Farm. |
| Requested (queue) date | 2020-04-24 |
| Proposed in-service date | — |
| Operational date | 2022-12-14 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata