Silver Maple Wind CNR (1020)

Silver Maple Wind CNR is a 20.0 MW wind interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at Emera Maine 115kV Transmission Line 66, between Graham Substation and Rebel Hill substation, adjacent to Pisgah Mountain Wind Farm..

20.0 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical nameSilver Maple Wind CNR
Queue ID1020
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity20.0 MW
StateMaine
CountyPenobscot
Point of interconnectionEmera Maine 115kV Transmission Line 66, between Graham Substation and Rebel Hill substation, adjacent to Pisgah Mountain Wind Farm.
Requested (queue) date2020-04-24
Proposed in-service date
Operational date2022-12-14
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata