Skelton Station Modernization Phase 1 (372)
Skelton Station Modernization Phase 1 is a 1.1 MW other interconnection project in York, Maine with a current status of operational. It is proposed to connect at CMP 34.5 kV Louden substation.
1.1 MWCapacity
OperationalStatus
MEMarket
OtherTechnology
Project facts
| Canonical name | Skelton Station Modernization Phase 1 |
|---|---|
| Queue ID | 372 |
| Status | operational |
| Source status | C |
| Market | ME |
| Technology | Other |
| Capacity | 1.1 MW |
| State | Maine |
| County | York |
| Point of interconnection | CMP 34.5 kV Louden substation |
| Requested (queue) date | 2011-08-03 |
| Proposed in-service date | — |
| Operational date | 2013-12-28 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata