Slocum Energy Storage (67758_SLOES)

Slocum Energy Storage is a 14.0 MW battery interconnection project in Wayne, Michigan with a current status of operational.

14.0 MWCapacity
OperationalStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameSlocum Energy Storage
Queue ID67758_SLOES
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyBattery
Capacity14.0 MW
StateMichigan
CountyWayne
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-02-01
Withdrawn date
Developer
Utility / transmission ownerDTE Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata