Solar addition (980)
Solar addition is a 10.0 MW solar interconnection project in Sullivan, New Hampshire with a current status of withdrawn. It is proposed to connect at River Road 46 kV (Bus No 108291) is same as the previous interconnection QP799.
10.0 MWCapacity
WithdrawnStatus
NHMarket
SolarTechnology
Project facts
| Canonical name | Solar addition |
|---|---|
| Queue ID | 980 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Solar |
| Capacity | 10.0 MW |
| State | New Hampshire |
| County | Sullivan |
| Point of interconnection | River Road 46 kV (Bus No 108291) is same as the previous interconnection QP799 |
| Requested (queue) date | 2020-03-26 |
| Proposed in-service date | 2022-11-15 |
| Operational date | — |
| Withdrawn date | 2021-03-05 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata