Solar and Battery (1383)

Solar and Battery is a 139.0 MW solar+battery interconnection project in Penoboscot, Maine with a current status of withdrawn. It is proposed to connect at 44°46'22.13"N, 68°29'5.84"W new switching station to tie into Versant 115 kV line in Clifton.

139.0 MWCapacity
WithdrawnStatus
BHEMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar and Battery
Queue ID1383
Statuswithdrawn
Source statusW
MarketBHE
TechnologySolar+Battery
Capacity139.0 MW
StateMaine
CountyPenoboscot
Point of interconnection44°46'22.13"N, 68°29'5.84"W new switching station to tie into Versant 115 kV line in Clifton
Requested (queue) date2023-04-13
Proposed in-service date2028-12-31
Operational date
Withdrawn date2023-12-15
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata