Solar and Battery (919)

Solar and Battery is a 5.0 MW solar+battery interconnection project in Knox, Maine with a current status of withdrawn. It is proposed to connect at CMP Thomaston Creek substation - Circuit 246D1.

5.0 MWCapacity
WithdrawnStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar and Battery
Queue ID919
Statuswithdrawn
Source statusW
MarketME
TechnologySolar+Battery
Capacity5.0 MW
StateMaine
CountyKnox
Point of interconnectionCMP Thomaston Creek substation - Circuit 246D1
Requested (queue) date2019-08-29
Proposed in-service date2020-12-31
Operational date
Withdrawn date2019-10-17
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata