Solar + Battery Storage (1135)

Solar + Battery Storage is a 113.0 MW solar+battery interconnection project in Coos, New Hampshire with a current status of withdrawn. It is proposed to connect at Eversource W179-1 115 kV Line between Berlin and Pontook Hydro Substations, 11.5 miles from the Berlin Substation.

113.0 MWCapacity
WithdrawnStatus
NHMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar + Battery Storage
Queue ID1135
Statuswithdrawn
Source statusW
MarketNH
TechnologySolar+Battery
Capacity113.0 MW
StateNew Hampshire
CountyCoos
Point of interconnectionEversource W179-1 115 kV Line between Berlin and Pontook Hydro Substations, 11.5 miles from the Berlin Substation
Requested (queue) date2021-05-13
Proposed in-service date2025-05-15
Operational date
Withdrawn date2023-02-02
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata