Solar CNR only (988)
Solar CNR only is a 30.0 MW solar interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at The Project will interconnect at National Grid’s 115 kV line I-135 via a new three circuit breaker ring bus switching station located at 2.9 miles from Eversource’s Fitzwilliam Substation and 20.5 miles from Fitchburg Gas & Electric Light Company’s Flagg Pond Substation..
30.0 MWCapacity
WithdrawnStatus
NHMarket
SolarTechnology
Project facts
| Canonical name | Solar CNR only |
|---|---|
| Queue ID | 988 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Solar |
| Capacity | 30.0 MW |
| State | New Hampshire |
| County | Cheshire |
| Point of interconnection | The Project will interconnect at National Grid’s 115 kV line I-135 via a new three circuit breaker ring bus switching station located at 2.9 miles from Eversource’s Fitzwilliam Substation and 20.5 miles from Fitchburg Gas & Electric Light Company’s Flagg Pond Substation. |
| Requested (queue) date | 2020-04-07 |
| Proposed in-service date | 2024-07-30 |
| Operational date | — |
| Withdrawn date | 2021-10-31 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.