Solar CNR only (988)

Solar CNR only is a 30.0 MW solar interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at The Project will interconnect at National Grid’s 115 kV line I-135 via a new three circuit breaker ring bus switching station located at 2.9 miles from Eversource’s Fitzwilliam Substation and 20.5 miles from Fitchburg Gas & Electric Light Company’s Flagg Pond Substation..

30.0 MWCapacity
WithdrawnStatus
NHMarket
SolarTechnology

Project facts

Canonical nameSolar CNR only
Queue ID988
Statuswithdrawn
Source statusW
MarketNH
TechnologySolar
Capacity30.0 MW
StateNew Hampshire
CountyCheshire
Point of interconnectionThe Project will interconnect at National Grid’s 115 kV line I-135 via a new three circuit breaker ring bus switching station located at 2.9 miles from Eversource’s Fitzwilliam Substation and 20.5 miles from Fitchburg Gas & Electric Light Company’s Flagg Pond Substation.
Requested (queue) date2020-04-07
Proposed in-service date2024-07-30
Operational date
Withdrawn date2021-10-31
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata