Solar (1038)

Solar is a 76.2 MW solar interconnection project in Merrimack, New Hampshire with a current status of withdrawn. It is proposed to connect at 3-breaker ring bus tap of the existing Comerford - Dunbarton Tap 230 kV line. This line is owned by National Grid and has the designation of Line B202 N. Latitude/ Longitude : 43.268, -71.66.

76.2 MWCapacity
WithdrawnStatus
NHMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID1038
Statuswithdrawn
Source statusW
MarketNH
TechnologySolar
Capacity76.2 MW
StateNew Hampshire
CountyMerrimack
Point of interconnection3-breaker ring bus tap of the existing Comerford - Dunbarton Tap 230 kV line. This line is owned by National Grid and has the designation of Line B202 N. Latitude/ Longitude : 43.268, -71.66
Requested (queue) date2020-08-07
Proposed in-service date2025-10-31
Operational date
Withdrawn date2025-06-17
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata