Solar is a 75.0 MW solar interconnection project in Franklin, Maine with a current status of withdrawn. It is proposed to connect at 115 kV New Sturtevant Substation (PSSE Bus Number: 100116).

75.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID1244
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity75.0 MW
StateMaine
CountyFranklin
Point of interconnection115 kV New Sturtevant Substation (PSSE Bus Number: 100116)
Requested (queue) date2022-03-31
Proposed in-service date2025-11-01
Operational date
Withdrawn date2022-11-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata