Solar (1328)

Solar is a 21.4 MW solar interconnection project in Grafton, New Hampshire with a current status of withdrawn. It is proposed to connect at 44.336047°, -71.874785°, National Grid 230 kV Substation.

21.4 MWCapacity
WithdrawnStatus
NHMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID1328
Statuswithdrawn
Source statusW
MarketNH
TechnologySolar
Capacity21.4 MW
StateNew Hampshire
CountyGrafton
Point of interconnection44.336047°, -71.874785°, National Grid 230 kV Substation
Requested (queue) date2022-10-24
Proposed in-service date2024-06-05
Operational date
Withdrawn date2023-04-27
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata