Solar (1330)
Solar is a 46.5 MW solar interconnection project in Sullivan, New Hampshire with a current status of withdrawn. It is proposed to connect at 43.177488°, -72.434553° - National Grid 115kV line.
46.5 MWCapacity
WithdrawnStatus
NHMarket
SolarTechnology
Project facts
| Canonical name | Solar |
|---|---|
| Queue ID | 1330 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Solar |
| Capacity | 46.5 MW |
| State | New Hampshire |
| County | Sullivan |
| Point of interconnection | 43.177488°, -72.434553° - National Grid 115kV line |
| Requested (queue) date | 2022-11-01 |
| Proposed in-service date | 2023-12-20 |
| Operational date | — |
| Withdrawn date | 2022-12-16 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata