solar (558)

solar is a 20.0 MW solar interconnection project in Franklin, Vermont with a current status of withdrawn. It is proposed to connect at 115 kV Highgate Substation.

20.0 MWCapacity
WithdrawnStatus
VTMarket
SolarTechnology

Project facts

Canonical namesolar
Queue ID558
Statuswithdrawn
Source statusW
MarketVT
TechnologySolar
Capacity20.0 MW
StateVermont
CountyFranklin
Point of interconnection115 kV Highgate Substation
Requested (queue) date2015-08-12
Proposed in-service date2016-12-01
Operational date
Withdrawn date2015-09-03
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.