Solar (567)

Solar is a 196.0 MW solar interconnection project in Franklin, Vermont with a current status of withdrawn. It is proposed to connect at VELCO Highgate Substation - 345 kV Bus.

196.0 MWCapacity
WithdrawnStatus
VTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID567
Statuswithdrawn
Source statusW
MarketVT
TechnologySolar
Capacity196.0 MW
StateVermont
CountyFranklin
Point of interconnectionVELCO Highgate Substation - 345 kV Bus
Requested (queue) date2015-09-11
Proposed in-service date2017-07-01
Operational date
Withdrawn date2015-09-21
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata