Solar (599)

Solar is a 65.0 MW solar interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at NGrid 115kV line from Vernon road tap to the Vernon Road Substation.

65.0 MWCapacity
WithdrawnStatus
VTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID599
Statuswithdrawn
Source statusW
MarketVT
TechnologySolar
Capacity65.0 MW
StateNew Hampshire
CountyCheshire
Point of interconnectionNGrid 115kV line from Vernon road tap to the Vernon Road Substation
Requested (queue) date2016-04-05
Proposed in-service date2018-04-18
Operational date
Withdrawn date2018-01-23
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata