Solar (623)

Solar is a 150.0 MW solar interconnection project in York, Maine with a current status of withdrawn. It is proposed to connect at CMP/Eversource 345 kV Line 391 from Buxton substation to Scobie Pond substation (approx. 27.7 miles from Buxton substation).

150.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID623
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity150.0 MW
StateMaine
CountyYork
Point of interconnectionCMP/Eversource 345 kV Line 391 from Buxton substation to Scobie Pond substation (approx. 27.7 miles from Buxton substation)
Requested (queue) date2016-10-31
Proposed in-service date2022-12-31
Operational date
Withdrawn date2021-08-12
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata