Solar (679)

Solar is a 20.0 MW solar interconnection project in Hillsborough, New Hampshire with a current status of withdrawn. It is proposed to connect at Eversource NH 34.5 kV line 313, between South Peterborough and Monadnock substations. The Project will tap this line at about 0.1-0.5 miles south of the South Peterborough substation..

20.0 MWCapacity
WithdrawnStatus
VTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID679
Statuswithdrawn
Source statusW
MarketVT
TechnologySolar
Capacity20.0 MW
StateNew Hampshire
CountyHillsborough
Point of interconnectionEversource NH 34.5 kV line 313, between South Peterborough and Monadnock substations. The Project will tap this line at about 0.1-0.5 miles south of the South Peterborough substation.
Requested (queue) date2017-08-03
Proposed in-service date2022-07-01
Operational date
Withdrawn date2021-01-26
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata