Solar is a 30.0 MW solar interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at Primary: NGRID 115 KV Line I-135 between Fitzwilliam Sub and Flagg Pond Sub Alternate 1: NGRID 115 KV Line J-136 between Bellows Falls Sub and Flagg Pond Sub Alternate 2: Eversource 115 KV Bus at Monadnock Substation via short 115 KV gentie line from project site.
Project facts
| Canonical name | Solar |
|---|---|
| Queue ID | 754 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Solar |
| Capacity | 30.0 MW |
| State | New Hampshire |
| County | Cheshire |
| Point of interconnection | Primary: NGRID 115 KV Line I-135 between Fitzwilliam Sub and Flagg Pond Sub Alternate 1: NGRID 115 KV Line J-136 between Bellows Falls Sub and Flagg Pond Sub Alternate 2: Eversource 115 KV Bus at Monadnock Substation via short 115 KV gentie line from project site |
| Requested (queue) date | 2018-04-25 |
| Proposed in-service date | 2024-07-30 |
| Operational date | — |
| Withdrawn date | 2021-10-31 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.