Solar (757)

Solar is a 20.0 MW solar interconnection project in Somerset, Maine with a current status of withdrawn. It is proposed to connect at Approximately at 44°42'47.78"N, 69°39'15.37"W at proposed interconnection substation to tap CMP Section 83 line and SAPI Somerset generator tap line. Substation to have short gen tie line to project site located between Kendall Annex Road and Middle Road in Fairfield, Maine.

20.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID757
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity20.0 MW
StateMaine
CountySomerset
Point of interconnectionApproximately at 44°42'47.78"N, 69°39'15.37"W at proposed interconnection substation to tap CMP Section 83 line and SAPI Somerset generator tap line. Substation to have short gen tie line to project site located between Kendall Annex Road and Middle Road in Fairfield, Maine
Requested (queue) date2018-04-26
Proposed in-service date2021-11-01
Operational date
Withdrawn date2020-08-12
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata