Solar (762)

Solar is a 22.5 MW solar interconnection project in Rutland, Vermont with a current status of withdrawn. It is proposed to connect at POI tap of GMP Florence - S. Middlebury Jct. 46 kV line, approx. 4 miles from Florence. Site is 13 acres on Carver Street/Syndicate Road, Brandon, VT 05733.

22.5 MWCapacity
WithdrawnStatus
VTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID762
Statuswithdrawn
Source statusW
MarketVT
TechnologySolar
Capacity22.5 MW
StateVermont
CountyRutland
Point of interconnectionPOI tap of GMP Florence - S. Middlebury Jct. 46 kV line, approx. 4 miles from Florence. Site is 13 acres on Carver Street/Syndicate Road, Brandon, VT 05733
Requested (queue) date2018-04-27
Proposed in-service date2020-08-01
Operational date
Withdrawn date2018-05-18
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata