Solar (775)

Solar is a 20.0 MW solar interconnection project in Kennebec, Maine with a current status of withdrawn. It is proposed to connect at CMP Albion to Detroit 115 kV line approximately 2.5 miles from Albion.

20.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID775
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity20.0 MW
StateMaine
CountyKennebec
Point of interconnectionCMP Albion to Detroit 115 kV line approximately 2.5 miles from Albion
Requested (queue) date2018-08-20
Proposed in-service date2021-11-01
Operational date
Withdrawn date2020-08-21
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.