Solar (805)

Solar is a 11.0 MW solar interconnection project in Middletown, Rhode Island with a current status of withdrawn. It is proposed to connect at GRID Jepson 37K33.

11.0 MWCapacity
WithdrawnStatus
RIMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID805
Statuswithdrawn
Source statusW
MarketRI
TechnologySolar
Capacity11.0 MW
StateRhode Island
CountyMiddletown
Point of interconnectionGRID Jepson 37K33
Requested (queue) date2018-12-10
Proposed in-service date2025-02-26
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata