Solar (839)

Solar is a 20.0 MW solar interconnection project in Kent, Rhode Island with a current status of operational. It is proposed to connect at GRID 3310 Feeder 34.5 kV to Kent County substation.

20.0 MWCapacity
OperationalStatus
RIMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID839
Statusoperational
Source statusC
MarketRI
TechnologySolar
Capacity20.0 MW
StateRhode Island
CountyKent
Point of interconnectionGRID 3310 Feeder 34.5 kV to Kent County substation
Requested (queue) date2019-02-25
Proposed in-service date
Operational date2023-03-17
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata