Solar is a 6.2 MW solar interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at NG feeder 26W7, Woonsocket substation.

6.2 MWCapacity
WithdrawnStatus
RIMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID870
Statuswithdrawn
Source statusW
MarketRI
TechnologySolar
Capacity6.2 MW
StateRhode Island
CountyProvidence
Point of interconnectionNG feeder 26W7, Woonsocket substation
Requested (queue) date2019-03-26
Proposed in-service date2025-03-10
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.