Solar (903)

Solar is a 7.0 MW solar interconnection project in Kennebec, Maine with a current status of operational. It is proposed to connect at CMP Winslow substation, Circuit 870D2.

7.0 MWCapacity
OperationalStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID903
Statusoperational
Source statusC
MarketME
TechnologySolar
Capacity7.0 MW
StateMaine
CountyKennebec
Point of interconnectionCMP Winslow substation, Circuit 870D2
Requested (queue) date2019-08-01
Proposed in-service date
Operational date2022-07-13
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata