Solar (923)

Solar is a 20.0 MW solar interconnection project in Androscoggin, Maine with a current status of operational. It is proposed to connect at CMP 34.5 kV Leeds substation.

20.0 MWCapacity
OperationalStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID923
Statusoperational
Source statusC
MarketME
TechnologySolar
Capacity20.0 MW
StateMaine
CountyAndroscoggin
Point of interconnectionCMP 34.5 kV Leeds substation
Requested (queue) date2019-09-03
Proposed in-service date
Operational date2025-02-25
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata