Solar (952)

Solar is a 5.0 MW solar interconnection project in Androscoggin, Maine with a current status of withdrawn. It is proposed to connect at CMP 34.5kV line. 44.074807, -70.280400.

5.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID952
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity5.0 MW
StateMaine
CountyAndroscoggin
Point of interconnectionCMP 34.5kV line. 44.074807, -70.280400
Requested (queue) date2020-02-18
Proposed in-service date2021-09-30
Operational date
Withdrawn date2020-04-08
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata