Solar plus Battery (1172)
Solar plus Battery is a 53.1 MW solar+battery interconnection project in Merrimack, New Hampshire with a current status of withdrawn. It is proposed to connect at Eversource 115kV F139 line.
53.1 MWCapacity
WithdrawnStatus
NHMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Solar plus Battery |
|---|---|
| Queue ID | 1172 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Solar+Battery |
| Capacity | 53.1 MW |
| State | New Hampshire |
| County | Merrimack |
| Point of interconnection | Eversource 115kV F139 line |
| Requested (queue) date | 2021-10-27 |
| Proposed in-service date | 2025-07-31 |
| Operational date | — |
| Withdrawn date | 2024-10-02 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata