Solar plus Battery (1295)

Solar plus Battery is a 205.0 MW solar+battery interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at Orrington-Albion Rd 345kV line (3023) near the town of Pittsfield (approximately 19 miles from Albion Rd Substation).

205.0 MWCapacity
WithdrawnStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar plus Battery
Queue ID1295
Statuswithdrawn
Source statusW
MarketME
TechnologySolar+Battery
Capacity205.0 MW
StateMaine
CountyAroostook
Point of interconnectionOrrington-Albion Rd 345kV line (3023) near the town of Pittsfield (approximately 19 miles from Albion Rd Substation)
Requested (queue) date2022-08-09
Proposed in-service date2025-11-28
Operational date
Withdrawn date2024-08-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata