Solar plus Battery (1316)

Solar plus Battery is a 102.0 MW solar+battery interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at Eversource 115kV line L163.

102.0 MWCapacity
WithdrawnStatus
NHMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar plus Battery
Queue ID1316
Statuswithdrawn
Source statusW
MarketNH
TechnologySolar+Battery
Capacity102.0 MW
StateNew Hampshire
CountyCheshire
Point of interconnectionEversource 115kV line L163
Requested (queue) date2022-09-30
Proposed in-service date2027-10-28
Operational date
Withdrawn date2023-08-25
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata