Solaris Energy Storage (1515)

Solaris Energy Storage is a 270.0 MW battery interconnection project in Kings, New York with a current status of withdrawn. It is proposed to connect at Greenwood 138kV Substation.

270.0 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameSolaris Energy Storage
Queue ID1515
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity270.0 MW
StateNew York
CountyKings
Point of interconnectionGreenwood 138kV Substation
Requested (queue) date2023-02-09
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperSolaris Solar
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata