Soles Rest Solar LLC (636)

Soles Rest Solar LLC is a 149.0 MW solar interconnection project in Elmore, Idaho with a current status of active. It is proposed to connect at Danskin–Hubbard 230kV Line.

149.0 MWCapacity
ActiveStatus
IDMarket
SolarTechnology

Project facts

Canonical nameSoles Rest Solar LLC
Queue ID636
Statusactive
Source statusConstruction
MarketID
TechnologySolar
Capacity149.0 MW
StateIdaho
CountyElmore
Point of interconnectionDanskin–Hubbard 230kV Line
Requested (queue) date2022-02-16
Proposed in-service date2027-11-03
Operational date
Withdrawn date
DeveloperSoles Rest Solar LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata