Sooner 138 kV Substation (GEN-2015-067)

Sooner 138 kV Substation is a 150.0 MW solar interconnection project in Noble County, Oklahoma with a current status of withdrawn. It is proposed to connect at Sooner 138 kV Substation.

150.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameSooner 138 kV Substation
Queue IDGEN-2015-067
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity150.0 MW
StateOklahoma
CountyNoble County
Point of interconnectionSooner 138 kV Substation
Requested (queue) date2015-10-07
Proposed in-service date
Operational date
Withdrawn date2017-06-01
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata