Sooner 345kV (GEN-2015-030)

Sooner 345kV is a 200.1 MW wind interconnection project in Noble County, Oklahoma with a current status of withdrawn. It is proposed to connect at Sooner 345kV.

200.1 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameSooner 345kV
Queue IDGEN-2015-030
Statuswithdrawn
Source statusTERMINATED
MarketOK
TechnologyWind
Capacity200.1 MW
StateOklahoma
CountyNoble County
Point of interconnectionSooner 345kV
Requested (queue) date2015-03-19
Proposed in-service date2017-11-01
Operational date
Withdrawn date2018-03-16
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata