South Ellensburg Substation (L0604)

South Ellensburg Substation is a 26.0 MW other interconnection project in Kittitas, Washington with a current status of active. It is proposed to connect at Ellensburg-Moxee No 1 115kV line.

26.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameSouth Ellensburg Substation
Queue IDL0604
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity26.0 MW
StateWashington
CountyKittitas
Point of interconnectionEllensburg-Moxee No 1 115kV line
Requested (queue) date2024-04-12
Proposed in-service date2027-04-15
Operational date
Withdrawn date
DeveloperCity of Ellensburg
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata