South Fond du Lac - Fitzgerald 345.0kV (J4115)

South Fond du Lac - Fitzgerald 345.0kV is a 525.0 MW gas interconnection project in Fond Du Lac, Wisconsin with a current status of operational. It is proposed to connect at South Fond du Lac - Fitzgerald 345.0kV.

525.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameSouth Fond du Lac - Fitzgerald 345.0kV
Queue IDJ4115
Statusoperational
Source statusActive
Market
TechnologyGas
Capacity525.0 MW
StateWisconsin
CountyFond Du Lac
Point of interconnectionSouth Fond du Lac - Fitzgerald 345.0kV
Requested (queue) date2025-10-06
Proposed in-service date2028-06-30
Operational date2028-06-30
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata