South Fond Du Lac to Fitzgerald 345 kV line (J1253)

South Fond Du Lac to Fitzgerald 345 kV line is a 100.0 MW solar interconnection project in Fond Du Lac County, Wisconsin with a current status of withdrawn. It is proposed to connect at South Fond Du Lac to Fitzgerald 345 kV line.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSouth Fond Du Lac to Fitzgerald 345 kV line
Queue IDJ1253
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateWisconsin
CountyFond Du Lac County
Point of interconnectionSouth Fond Du Lac to Fitzgerald 345 kV line
Requested (queue) date2019-04-29
Proposed in-service date2021-08-01
Operational date2021-08-01
Withdrawn date2024-10-18
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata