South Hays 230 kV Substation (GEN-2015-072)

South Hays 230 kV Substation is a 20.9 MW solar interconnection project in Ellis County, Kansas with a current status of withdrawn. It is proposed to connect at South Hays 230 kV Substation.

20.9 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameSouth Hays 230 kV Substation
Queue IDGEN-2015-072
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity20.9 MW
StateKansas
CountyEllis County
Point of interconnectionSouth Hays 230 kV Substation
Requested (queue) date2015-10-09
Proposed in-service date
Operational date
Withdrawn date2016-03-17
Developer
Utility / transmission ownerMIDW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata